NEWS

Driving simulator dome in Sindelfingen
26.05. 2010 Report in Daimler Supplier Magazine, a magazine for suppliers and employees of Daimler AG more...
Driving simulator dome ausgeliefert!
26.02. 2010 After more than two years of design and production period, the 5.5-ton simulator shell with a diameter of about eight meters has left our industrial premises to be transported to the client Daimler AG in Sindelfingen.
more...
Factory Qualification by Germanischer Lloyd (GL)
03.02. 2010 Hahlbrock obtains approval (no. KBZ 1124 HH) by Germanischer Lloyd  to produce components made of fibre-reinforced plastics.
more...
AIDAblu is leaving the construction dock of the Meyer Werft
07.01. 2010 Also for this cruise ship Hahlbrock has produced the large-format lightbuilding construction.
more...
Pipeline of Health
16.07. 2009 Bright red, 9 m long, 3 m in diameter and made of glass fiber reinforced plastic, the tube attracks all the attention. more...